AEWORLDMAP.COM (2,110 posts)

A research project from the Architectural Engineering program at The University of Texas at Austin – featuring contemporary architecture, engineering and construction around the world.

The Bullitt Center – Seattle, Washington

leave a comment »

ext-bullitt constr-bullitt plan-bullitt

[1], [2], [3]

Building: The Bullitt Center
Location: Seattle, Washington
Architect: Miller Hull Partnership
Structural: DCI Engineers
MEP: PAE
Mechanical: PSF Mechanical
General Contractor (core & shell): Schuchart
Client: The Bullitt Foundation
Completion: 2014

AE Interest: Largest net-zero commercial building in US (as of 2016), 250-year life span design, steel/concrete construction on first two levels, flu-lam and sustainably harvested Douglas fir above 2nd floor, geothermal heating, radiant slabs, heat recovery ventilation, 5 aerobic composers on site, 575 panel solar array, power-generating elevators, greywater reuse, 3rd floor includes constructed wetlands, steel window shading, certified living building

Video: [1]

Full Team, Credits, and Features: [1]

 

-tp

Written by Tiolina Pistilli

September 8, 2016 at 7:46 am

Posted in Built

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s