AEWORLDMAP.COM (1,785 posts)

Website support by BMHdesignstudio.com

Author Archive

Harpa Concert Hall – Reykjavik, Iceland

with one comment

Building: Harpa Concert Hall
Location: Rekjavik, Iceland
Completion: 2011
Architect: Henning Larsen Architects
Architect of Record: Batteríið Architects
Facade Design: Olafur Eliasson

AE Interest: facade

Written by Eleanor Reynolds

June 1, 2011 at 3:58 am

Posted in Built

Garibaldi Exhibition Building – Milan, Italy

leave a comment »

Building: Garibaldi Exhibition Building
Location: Milan, Italy
Competition won: 2006
Architect: Grimshaw

AE Interest: form

Written by Eleanor Reynolds

April 29, 2011 at 9:15 am

Posted in Proposed Design

Mediacite – Liege, Belgium

leave a comment »

   

Building: Mediacite
Location: Liege, Belgium
Completion: 2009
Architect: Ran Arad
Structural Engineer: Buro Happold

AE Interest: roof structure – ‘complex network of steel roof ribs that undulate through the mall’

UTL2011-E, UTL2011-A?
Article 1

Written by Eleanor Reynolds

April 25, 2011 at 1:15 pm

Posted in Built

London 2012 Water Polo Arena – London, UK

leave a comment »

  

Building: London 2012 Water Polo Arena
Location: London, UK
Completion: due 2012
Architect: David Morley Architects
Structural Engineer: Buro Happold

AE Interest: air-inflated rippling roof made of recycled PVC cushions, temporary for 2012 London Olympics

UTL2011-E

Written by Eleanor Reynolds

April 25, 2011 at 1:05 pm

Posted in Under Construction

Glasgow Museum of Transport – Glasgow, Scotland

leave a comment »

  

Building: Glasgow Museum of Transport
Location: Glasgow, Scotland
Completion: due 2011
Architect: Zaha Hadid Architects
Structural Engineer: Buro Happold
Services Engineer: Buro Happold
Facade Engineer: Buro Happold

AE Interest: form, wall-roof structure

UTL2011-E, UTL2011-A?

Written by Eleanor Reynolds

April 25, 2011 at 9:27 am

Posted in Under Construction

Cathedral Bridge – Derby, UK

leave a comment »

Building: Cathedral Bridge
Location: River Derwent, Cathedral Green, Derby, UK
Completion: 2009
Architect: Ramboll UK
Bridge Engineer: Ramboll

AE Interests: cable-stayed swing bridge form, 38m span

Article 1

Written by Eleanor Reynolds

April 21, 2011 at 4:06 pm

Posted in Built

Norwich Open Academy

leave a comment »

 

Building: Norwich Open Academy
Location: Marryat Road, Norwich, UK
Completion: 2010
Architect: Sheppard Robson
Structural Engineering: Ramboll

AE Interests: Laminated timber structure

Article 1

Written by Eleanor Reynolds

April 21, 2011 at 3:37 pm

Posted in Built

Old Livestock Market in Hereford Development

leave a comment »

Location: Hereford, Herefordshire
Completion: due 2013
Partner: Hereford Futures
Developer/Development Manager: Stanhope
Architect: Leslie Jones
Masterplanner: Allies & Morrison
Structural Engineer: Ramboll (formerly Ramboll Whitbybird)
Services Engineer: Cudd Bentley Consulting
Cost Consultant: Cyril Sweett
Construction Manager: Pinnacle Transportation

AE Interests: regeneration of the historic city of Hereford

Written by Eleanor Reynolds

April 21, 2011 at 3:18 pm

Posted in Proposed Design

55 Baker Street – London, UK

leave a comment »

Building: 55 Baker Street
Location: London, UK
Completion: 2008
Architect: Make Architects

AE Interest: form, facade, BREEAM ‘excellent’ rating

Written by Eleanor Reynolds

April 20, 2011 at 2:52 pm

Posted in Built

University Square Stratford – London, UK

leave a comment »

 

Building: University Square Stratford
Location: East London, UK
Completion: due 2013
Architect: Make Architects

AE Interest: highly flexible teaching and administrative spaces

Article 1

Written by Eleanor Reynolds

April 20, 2011 at 2:42 pm

Posted in Under Construction

Siemens Sustainability Centre – London, UK

leave a comment »

Building: Siemens sustainability centre
Location: London, UK (Royal Victoria Docks)
Completion: due 2012
Architect: Wilkinson Eyre Architects

AE Interest: Sustainability (BREEAM), building shell form

Written by Eleanor Reynolds

April 20, 2011 at 2:31 pm

Posted in Under Construction

Cambridge Hauser Forum – Cambridge, UK

leave a comment »

Building: Cambridge Hauser Forum
Location: Cambridge, UK
Completion: 2010
Architect: Wilkinson Eyre Architects

AE Interest: Sustainability

Written by Eleanor Reynolds

April 20, 2011 at 2:25 pm

Posted in Built

UK Centre for Medical Research and Innovation – London, UK

leave a comment »

Building: UK Centre for Medical Research and Innovation
Location: London, UK
Completion: due 2015
Architect: PLP Architecture and HOK Architects

AE Interest: roof form, advance bio-medical research facility

Article 1

Written by Eleanor Reynolds

April 20, 2011 at 2:02 pm

Posted in Proposed Design

Oxford Street Visitor Information Kiosk – London, UK

leave a comment »

Building: Oxford Street Visitor Information Kiosk
Location: London, UK
Architect: PLP Architecture

AE Interest: ‘soaring’ glass roof

Article 1

Written by Eleanor Reynolds

April 20, 2011 at 1:53 pm

Posted in Proposed Design

Four Seasons – London, UK

leave a comment »

Building: Four Seasons Hotel and Residences
Location: London, UK(Heron Plaza)
Completion: due 2015
Architect: PLP Architecture

AE Interest: Skyscraper in urban London

Written by Eleanor Reynolds

April 20, 2011 at 1:40 pm

Posted in Proposed Design

Four Seasons – Abu Dhabi

leave a comment »

Building: Four Seasons Hotel and Residences
Location: Abu Dhabi at Sowwah Island
Architect: PLP Architecture

Written by Eleanor Reynolds

April 20, 2011 at 1:36 pm

Posted in Proposed Design

World Wildlife Fund Headquarters – Woking, UK

leave a comment »

Building: World Wildlife Fund Headquarters
Location: Woking, UK
Architect: Hopkins Architects
Structural Engineers: Expedition Engineering

AE Interest: maximizes on-site sustainable features, aims for ‘Outstanding’ BREEAM rating

Article 1

Written by Eleanor Reynolds

April 20, 2011 at 1:28 pm

Posted in Proposed Design

Guy’s and St Thomas’ East Wing Re-cladding – London, UK

leave a comment »

Building: Guy’s and St Thomas’ East Wing
Location: London, UK
Architect: Hopkins Architects
Engineering Consultant: ARUP

AE Interest: creates a thermal buffer zone and two new triangular atria

Article 1

Written by Eleanor Reynolds

April 20, 2011 at 1:21 pm

Posted in Proposed Design

Paperhouse Newspaper Kiosks – London, UK

leave a comment »

Installation: Paperhouse Newspaper kiosks
Location: London, UK at Sloane Square and Earl’s Court
Completed: 2009
Architect: Heatherwick Studio (Thomas Heatherwick)

AE Interest: ergonomic arrangement of magazine shelves, roof sections made of toughened glass

Article 1

Written by Eleanor Reynolds

April 20, 2011 at 12:58 pm

Posted in Built

Guys Approches at Guy’s Hospital – London, UK

leave a comment »

Building: Guys Approches at Guy’s Hospital
Location: London, UK (by London Bridge)
Completed: 2007
Architect: Heatherwick Studio (Thomas Heatherwick)

AE Interest: tiled cladding system wrapping around the boiler house fabricated from high grade stainless steel frames, with braid woven through as the “warp”

Written by Eleanor Reynolds

April 20, 2011 at 12:52 pm

Posted in Built

Vents at Paternoster Square – London, UK

leave a comment »

Installation: Vents at Paternoster Square
Location: London, UK
Architect: Heatherwick Studio (Thomas Heatherwick)

AE: Interest: The aesthetic design is derived from experiments with folded paper

Written by Eleanor Reynolds

April 20, 2011 at 12:45 pm

Posted in Built

Royal Shakespeare Theatre Transformation – Stratford-upon-Avon, UK

leave a comment »

Building: Royal Shakespeare Theatre Transformation
Location: Stratford-upon-Avon, UK
Architect: Bennetts Associates
Engineering: Buro Happold

AE Interest: new basement under the stage is in a flood zone next to the River Avon

UTL2011-A, UTL2011-E

Article 1

Written by Eleanor Reynolds

April 19, 2011 at 4:33 pm

Posted in Built

Elizabeth II Court for Hampshire County Council – Winchester, UK

leave a comment »

Building: Elizabeth II Court for Hampshire County Council
Location: Winchester, UK (just outside of London)
Architect: Bennetts Associates

AE Interests: retrofit (open plan upgrade), sustainability

Article 1

Written by Eleanor Reynolds

April 19, 2011 at 4:31 pm

Posted in Built

Mint Hotel Tower of London – London, UK

leave a comment »

 

Building: Mint Hotel Tower of London
Location: London, UK
Architect: Bennetts Associates

AE Interests: Living walls, cantilevered structure

UTL2011-A, UTL2011-E

Article 1, Article 2

Written by Eleanor Reynolds

April 19, 2011 at 4:29 pm

Posted in Built

New Street Square – London, UK

leave a comment »

Building: New Street Square
Location: London, UK
Architect: Bennetts Associates

AE Interests: urban renewal, living wall

UTL2011-A, UTL2011-E

Article 1

Written by Eleanor Reynolds

April 19, 2011 at 4:27 pm

Posted in Built

Monsoon Headquarters – London, UK

leave a comment »

 

Building: Monsoon Headquarters
Location: Paddington Basin, London, UK
Architect: Allford Hall Monaghan Morris (AHMM)
Structural Engineer: Adams Kara Taylor (AKT)

AE Interst: Structural System

UTL2011-E, UTL2011-A?
Article 1

Written by Eleanor Reynolds

April 18, 2011 at 11:57 am

Posted in Built

Adelaide Wharf – London, UK

leave a comment »

Building: Adelaide Wharf
Location: Shoreditch, London, UK
Architect: Allford Hall Monaghan Morris (AHMM)
Structural Engineer: Adams Kara Taylor (AKT)
Construction: Faithful + Gould

AE Interst: Sustainability (brown roof), featured in the ‘Sustainable London’ series by The Building Centre

Written by Eleanor Reynolds

April 18, 2011 at 11:49 am

Posted in Built

Victoria & Albert Museum Extension – London, UK

leave a comment »

Building: Victoria & Albert Museum Extension
Location: London, UK
Architect: Amanda Levet Architects

AE Interests: complex geometry

Written by Eleanor Reynolds

April 15, 2011 at 1:51 pm

Posted in Proposed Design

Cultural Centre – Lisbon, Portugal

leave a comment »

Building: Cultural Centre
Location: Lisbon, Portugal (on Tagus River)
Architect: Amanda Levet Architects

AE Interests: complex geometry

Written by Eleanor Reynolds

April 15, 2011 at 1:35 pm

Posted in Proposed Design

Globe Academy – London, UK

leave a comment »

Building: Globe Academy
Location: London, UK
Architect: Amanda Levete Architects
Completion: 2010

AE Interests: expressed structure

Written by Eleanor Reynolds

April 15, 2011 at 1:25 pm

Posted in Built

Barts and the Royal London New Hospital – London, UK

leave a comment »

Building: Barts and the Royal London New Hospitals Programme
Location: London, UK
Project Manager: Skanska
Completion: due 2016

AE Interests: Construction in urban London
Article 1

Written by Eleanor Reynolds

April 14, 2011 at 4:09 pm

Posted in Under Construction

Heron Tower – London, UK

leave a comment »

  

Building: Heron Tower (110 Bishopsgate)
Location: London, UK
Architect: Kohn Pedersen Fox
Project Manager: Skanska
Completion: 2010

AE Interests: Skyscraper, Construction in urban London

Written by Eleanor Reynolds

April 14, 2011 at 4:02 pm

Posted in Built

More London Development – London, UK

leave a comment »

Building: More London Development
Location: London, UK
Completion: under construction
Architect: Norman Foster (masterplan)
Construction Delivery/Construction Management: Mace
Client: More London Development

AE Interest: BREEAM outstanding rating

Written by Eleanor Reynolds

April 14, 2011 at 3:56 pm

100 East Road – London, UK

leave a comment »

Building: 100 East Road
Location: Hoxton, London, UK
Architect: Feilden Clegg Bradley
Program & Project Management: Mace
Client: JG Land

AE Interst: BREEAM Excellent rating

Written by Eleanor Reynolds

April 14, 2011 at 3:47 pm

Posted in Built

King’s Cross St Pancras Station – London, UK

leave a comment »

  

Building: King’s Cross St Pancras Station
Location: London, UK
Construction: Balfour Beatty
Client: Transport for London
Completed: 2009

AE Interest: underground construction in urban London

Written by Eleanor Reynolds

April 14, 2011 at 2:59 pm

Posted in Built

Evelyn Grace Academy – London, UK

leave a comment »

Building: Evelyn Grace Academy
Location: London, UK
Architect: Zaha Hadid Architects
Project Manager: Capita Symonds
Structural Engineer: Arup
Quantity Surveyors: Davis Langdon
Landscape: Gross Max
Acoustic: Sandy Brown Associates
Fire Engineer: SAFE
CDM CO-ORD: Arup
Completion: 2010

AE Interests: complex geometry

UTL2011-A?, UTL2011-E

Written by Eleanor Reynolds

April 14, 2011 at 2:47 pm

Posted in Built

Nunawading Station – Melbourne, Australia

leave a comment »

Building: Nunawading Station
Location: Melbourne, Australia
Architect: Grimshaw
Completion: 2010

AE Interests: cantilevered roof
Article 1

Written by Eleanor Reynolds

April 14, 2011 at 2:40 pm

Posted in Built

Newport Station – Newport, Whales, UK

leave a comment »

  

Building: Newport Station
Location: Newport, Whales, UK
Architect: Grimshaw
Structural Engineer: Atkins
Building Services Engineer: Atkins
Quality Surveyor: Faithful + Gould (Atkins)
Completion: 2010

AE Interests: complex geometry
Article 1
, Article 2

Written by Eleanor Reynolds

April 14, 2011 at 2:35 pm

Posted in Built

Perryn Road Footbridge – London, UK

leave a comment »

Building: Perryn Road Footbridge
Location: Acton (west London), UK
Architect: Grimshaw
Main Contractor: Carillion/SH Structures
Completion: 2010

AE Interests: structural expression

Written by Eleanor Reynolds

April 14, 2011 at 1:11 pm

Posted in Built

The St. Botolph Building – London, UK

leave a comment »

Building: The St. Botolph Building
Location: London, UK
Architect: Grimshaw
Structural Engineer: ARUP
Services Engineer: Roger Preston and Partners
Quantity Surveyor: Sense Cost Consultancy
Main Contractor: Skanska
Completion: 2010

AE Interests: large development in urban London
Article 1

Written by Eleanor Reynolds

April 14, 2011 at 1:07 pm

Posted in Built

ExCel Exhibition Center – London, UK

leave a comment »

Building: ExCel Exhibition Center Phase II
Location: London Borough of Newham, UK
Architect: Grimshaw
Structural Engineer: McAlpine Design Group
Services Engineer: Hoare Lea
Quantity Surveyor: Gardiner & Theobald LLP
Main Contractor: Sir Robert McAlpine
Project Manager: Gardiner & Theodbald LLP
Completion: Phase I (2000), Phase II (2010)

AE Interests: complex geometry, external lighting strategy
Article 1

Written by Eleanor Reynolds

April 13, 2011 at 2:41 pm

Posted in Built

Serpentine Gallery Pavilion 2011- London, UK

leave a comment »

Building: Serpentine Gallery Pavilion 2011
Location: London, UK
Completion: due Summer 2011
Dismantled: due Fall 2011
Architect: Peter Zumthor
Client: Serpentine Gallery

AE Interest: temporary pavilion in central London
Article 1

Written by Eleanor Reynolds

April 12, 2011 at 2:58 pm

Posted in Built

Cloud 360 – Sungnam, South Korea

leave a comment »

Building: Cloud 360
Architect: Kyungam Architects (Changki Yun)
Partner: Jaeyoo Yoo
Designer: Taehyung Lim, Kyeongmin Kim, Yunmi Kang
Client: Sungam District

AE Interests: complex geometry, glass technology

Written by Eleanor Reynolds

January 31, 2011 at 3:29 pm

Posted in Proposed Design

OVO – Wroclaw, Poland

leave a comment »

Name: OVO (Hilton Wroclaw)
Location: Wroclaw, Poland
Client: Wings Properties
Architect: Gottersman Szmelcman Architecture
Architect of Record: Broadway Malyan Polska
Structural Engineer: Buro Happold
Building System Engineer: Buro Happold

AE Interests: form, located in a regeneration area, acrylic polymer facade

Written by Eleanor Reynolds

April 23, 2010 at 9:57 am

Posted in Under Construction

King Abdulla Financial District – El Seif Engineering

leave a comment »

Building: King Abdulla Financial District Parcels 3.04 and 3.05
Location: Riyadh, Saudi Arabia
Expected Completion: 2011
Design Build Contractor: El Seif Engineering

Written by Eleanor Reynolds

November 12, 2009 at 4:08 pm

Posted in Under Construction

King Abdulla Financial District – Saudi Binladin Group

leave a comment »

kafd 209

kafd 407

Building: King Abdulla Financial District Parcels 2.09, 2.14, 4.07, and 4.08
Location: Riyadh, Saudi Arabia
Expected Completion: 2011
Design Build Contractor: Saudi Binladin Group
Architect: FX – FOWLE
Structural Design: Buro Happold
Building System Design: Buro Happold

AE Interest: LEED, Environmental Modeling Analysis, Natural Lighting, Solar Shading, Fast Track, Design-Build

Written by Eleanor Reynolds

November 11, 2009 at 4:52 pm

Posted in Under Construction

King Abdullah Financial District Hotel

leave a comment »

Building: King Abdullah Financial District Hotel
Location: Riyadh, Saudi Arabia
Expected Completion: 2011
Architectural Design: Goettsch Partners
Contractor: Saudi Oger Ltd.
Developer: Rayadah Investment Co.

AE Interests: LEED accredited, large opening

Written by Eleanor Reynolds

November 9, 2009 at 3:12 pm

Posted in Under Construction

King Abdullah Financial District – Riyadh, Saudi Arabia

with one comment

Building: King Abdullah Financial District
Location: Riyadh, Saudi Arabia
Expected Completion: 2011
Architecture Master Plan: Henning Larsen Architects
Infrastructure Design: AECOM Technology Corporation
Land Owner: Saudi Public Pension Agency
Local Architecture and Engineering Adviser: Omrania & Associates

AE Interests: Fast track development of 1.6 million sq m site, to be completed in 3.5 years, no motor traffic, currently constructing 10 design build parcels

Written by Eleanor Reynolds

October 19, 2009 at 2:34 pm

Glass Tower – Los Angeles, California

leave a comment »

Building: Glass Tower
Location: La Cienega and Jefferson, LosAngeles, California
Completion: Proposed
Architect: Eric Owen Moss Architects
Structural Design: Buro Happold

AE Interests: parametric design, structure, louvers

Articles:
from the Architect

Written by Eleanor Reynolds

August 27, 2009 at 11:51 am

Posted in Proposed Design

Follow

Get every new post delivered to your Inbox.

Join 52 other followers

%d bloggers like this: